Flying Whale J43-32 Chlorinated Rubber Thick Paste Topcoat
Product overview
A one-component quick-drying topcoat composed of chlorinated rubber resin, plasticizer, coloring pigment, etc. The paint film has excellent water resistance and good corrosion resistance; the paint film dries quickly, can be low-temperature construction, convenient maintenance; has good decoration and durability.
Recommended use
Ship protection paint field:
It is suitable for anticorrosive decorative topcoat on the surface of hull outer plate, deck, superstructure and other steel structure surfaces.
Industrial protective paint field:
Applicable to the coastal steel structure, oil refining plant, power plant, steel structure and all kinds of equipment and facilities such as anti-corrosion finish.
Product Information
Color
|
In green, sea blue, purple and other colors |
Gloss
|
half light |
Volumetric solids | 46±3% |
Recommended dry film thickness | 40 microns dry film thickness/approx. 87 microns wet film thickness |
Theoretical coating rate | 7.77 m2/kg (40 micron dry film meter) |
Volatile Organic Compounds (VOC) | 420g/L |
DensityNote
|
Approximately 1.48kg/l |
Dry data
Substock temperature | 5 ℃ | 10 ℃ | 23℃ | 35℃ |
Paint film surface dry | 4 hours | 3 hours | 2 hours | 1 hour |
Solid paint film | 24 hours | 18 hours | 12 hours | 8 hours |
Overcoating data
Substock temperature | 5 ℃ | 10 ℃ | 23℃ | 35℃ |
Minimum coating interval | 12 hours | 10 hours | 8 hours | 6 hours |
Maximum coating interval | Unlimited | Unlimited | Unlimited | Unlimited |
Note: 1. The above data are for reference only. The actual drying time and the length of the re-coating interval depend on the film thickness, ventilation, humidity, lower paint and mechanical strength, etc.
2. The surface of the paint film before recoating must be clean and dry, free of pulverization and other pollutants. If necessary, the surface before recoating should be fully napped.
Construction parameters
Thinner/cleaning agent | Flying Whale X-101 Thinner |
airless spraying |
Nozzle diameter: 0.48~0.59mm Nozzle pressure: 15 ~ 25MPa Dilution ratio: 0 ~ 5% (by weight) |
Gas spraying | The use of suitable special equipment, spraying when the need for dilution |
Brush/Roller | Applicable, recommended for pre-coating and small-scale coating |
CONSTRUCTION CONDITIONS
The substrate temperature shall be at least 3 ℃ higher than the air dew point, and the relative humidity shall be lower than 85%. The measurement of temperature and humidity should be carried out at the substrate near the operation point. When the construction is not in an open space, good ventilation must be provided to ensure the normal drying of the paint film.
Surface treatment
All surfaces to be coated shall be clean, dry and free of contaminants and shall be evaluated and treated as ISO8504. Painted surfaces shall be clean, dry and intact on a compatible primer.
Typical supporting
615 aluminum powder chlorinated rubber antirust paint | 2 x 60 microns (dry film thickness) |
616 iron red chlorinated rubber thick slurry type antirust paint | 2 x 75 microns (dry film thickness) |
J43-32 chlorinated rubber thick paste type topcoat | 2 x 40 microns (dry film thickness) |
For more scope of use, please consult Flying Whale New Material Company.
Safety and Health
Before using this product, please pay attention to the safety label on the packaging container, refer to and follow the information and precautions related to health and safety in the product safety technical manual of flying whale new material company. During the construction and drying of the product, appropriate ventilation and preventive measures must be adopted to control the solvent concentration within the safety limit to prevent poisoning or hypoxia. Take measures to avoid skin and eye contact with the product. If contact occurs, wash it immediately with suitable detergent, soap and water. If splashed into eyes, rinse with water and seek medical treatment immediately.
Packing specification
Packing barrel specification | Packing weight |
18 Litres | 22kg |
Storage period
Store in a cool, dry, ventilated and dedicated warehouse away from heat sources. Under normal temperature conditions, the storage period is 12 months, and then it needs to be used after passing the inspection.
Precautions
The remaining packaging barrels must be tightly covered after painting to avoid damage caused by moisture. Contacting with water, acid and alkali is strictly prohibited in the process of painting and coating.
Corporate Statement
The above information and data of this product are accumulated according to our test and actual use experience, which can be used as a construction guide. For the construction carried out without our knowledge, we only guarantee the quality of the paint itself and are not responsible for any product performance problems arising from other aspects. We have the right to modify this manual according to the continuous improvement of the product.
Supplementary Notes
Key words:
The bottom of the ship and the waterline parts with anti-fouling requirements.
Waterline and freeboard
Deck part
Superstructure
Ballast tank
Living Cabin
Battery compartment
Drinking water tank
Pretreatment of steel plate
Oil tank
More products
Leave us a message