Flying Whale High Solid Epoxy Glass Flake Paint 680

Product overview

Two-component ultra-high solid content polyamine adduct cured epoxy glass flake.

Recommended use

At the same time, it can be applied to offshore equipment and onshore facilities. It is specially designed for industrial heavy anti-corrosion and other harsh corrosive environments. The glass flake strengthening technology can effectively improve the impact resistance and wear resistance of the coating. It has excellent anti-cracking performance, sea water resistance and anti-corrosion performance. The single coating completed by one coating can achieve long-term protection effect and can be compatible with well-designed cathodic protection system, it has strong adhesion in a variety of surface states, and can also be applied to wet sandblasted substrates (whether the surface is dry or wet).

Product Information

Color
Gray, yellow (color according to customer requirements)
Gloss
There is light
Component B (curing agent) Flying whale high solid epoxy glass flake paint 680 curing agent
Volumetric solids 86±3%
Recommended dry film thickness 150-1000 microns/approx. 174-1163 microns wet film thickness
Theoretical coating rate 1.91 m2/kg, 2.87 m2/liter (300 micron dry film meter).
Volatile Organic Compounds (VOC) 165g/l
DensityNote
Approximately 1.50kg/l
Note: Density data are typical parameters and vary with color

Dry data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Paint film surface dry

Solid paint film

Fully Cured

Mixed life

14 hours

30 hours

18 days

4 hours

6 hours

18 hours

14 days

2 hours

4 hours

10 hours

5 days

1.5 hours

3 hours

6 hours

5 days

1 hour

Overcoating data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Minimum coating interval

Maximum coating interval

36 hours

30 days

20 hours

14 days

14 hours

10 days

10 hours

7 days

Note: 1. The above data are for reference only. The actual drying time and the length of the re-coating interval depend on the film thickness, ventilation, humidity, lower paint and mechanical strength, etc.

2. The surface of the paint film before recoating must be clean and dry, free of pulverization and other pollutants. If necessary, the surface before recoating should be fully napped.

Construction parameters

Mixing Use a power mixer to stir component A evenly, and then add component B while stirring until fully mixed.
ripening At the temperature below 10 ℃, aging for 15 minutes
mixing ratio Component A: Component B = 25.8:4.2 (weight ratio)
Thinner/cleaning agent Flying Whale X-103 Thinner
airless spraying

Nozzle diameter: 0.53~0.69mm

Nozzle pressure: 15 ~ 20MPa

Dilution ratio: 0 ~ 5% (by weight)

Gas spraying The use of suitable special equipment, spraying when the need for dilution
Brush/Roller Applicable, recommended for pre-coating and small-scale coating

CONSTRUCTION CONDITIONS

During the coating process and coating curing process, ensure that the substrate temperature is higher than 0°C (32 °F), and the surface temperature of the substrate during the coating process should be at least 3°C (5 °F) higher than the dew point temperature.

Surface treatment

The performance and quality of the coating depend on the quality grade of the surface treatment. Bare steel: sand blasting meets the ISO-8501-1 Sa2 or Sa2 ½ of the international standard. The surface roughness after sand blasting is recommended to be controlled at 40-80 microns. High-pressure water jet cleaning meets the WJ2/3 L of SSPC-VIS 4 standard. Wheel pieces polished to St3; Primer steel coated in workshop: slightly sweep sand or use elastic grinding wheel to polish the corroded part to Grade St3; For welding, flame cutting or burning parts: after removing welding slag and spatter, polish them with elastic grinding wheel to Grade St3 to determine the pre-coating compatible with them: the surface must be clean and dry, and all pollutants have been removed.

Typical supporting

Atmospheric protection: flying whale high solid epoxy glass flake paint 680

Polyurethane, Fluorocarbon, Silicone paint

1 x 150-200 microns (dry film thickness)

1 x 50-75 microns (dry film thickness)

Immersion and harsh marine environment (tidal, marine wind power base, etc.):

Flying Whale High Solid Epoxy Glass Flake Paint 680 2 x 300 microns (dry film thickness)

For more scope of use, please consult Flying Whale New Material Company.

Safety and Health

Before using this product, please pay attention to the safety label on the packaging container, refer to and follow the information and precautions related to health and safety in the product safety technical manual of flying whale new material company. During the construction and drying of the product, appropriate ventilation and preventive measures must be adopted to control the solvent concentration within the safety limit to prevent poisoning or hypoxia. Take measures to avoid skin and eye contact with the product. If contact occurs, wash it immediately with suitable detergent, soap and water. If splashed into eyes, rinse with water and seek medical treatment immediately.

Packing specification

  Packing barrel specification Weight Packing Volume Packing
Group A 20 Litres 25.8kg 16 liters
Component B 5 Litres 4.2kg 4 liters

Storage period

Store in a cool, dry, ventilated and dedicated warehouse away from heat sources. Under normal temperature conditions, the storage period is 12 months, and then it needs to be used after passing the inspection.

Precautions

Corporate Statement

The above information and data of this product are accumulated according to our test and actual use experience, which can be used as a construction guide. For the construction carried out without our knowledge, we only guarantee the quality of the paint itself and are not responsible for any product performance problems arising from other aspects. We have the right to modify this manual according to the continuous improvement of the product.

Supplementary Notes

Theoretical coating rate

dry film

wet film

Theoretical coating rate

Theoretical coating rate

150 micron

174 micron

3.82 m/kg

5.73 m/l

300 micron

349 micron

1.91 m/kg

2.87 m/l

600 micron

698 micron

0.96 m/kg

1.44 m/l

1000 micron

1163 micron

0.57 m/kg

0.86 m/l

 

Coating interval of coating(@ 600 microns)

Post-coating of coating

Coating interval

0℃

10 ℃

20℃

30℃

40℃

Self-coating

Minimum coating interval

22 hours

10 hours

4.5

2.5

1.5

Maximum coating interval

30 days

30 days

28 days

21 days

14 days

Various epoxy

Minimum coating interval

20 hours

8 hours

4 hours

2 hours

1.5 hours

Maximum coating interval

30 days

14 days

10 days

7 days

4 days

Polyurethane, Fluorocarbon paint

Minimum coating interval

36 hours

20 hours

14 hours

10 hours

6 hours

Maximum coating interval

30 days

14 days

10 days

7 days

4 days

engineering siloxane

Minimum coating interval

32 hours

18 hours

12 hours

8 hours

4 hours

Maximum coating interval

30 days

21 days

14 days

10 days

7 days

Note: Make sure that the surface is clean, dry and all contaminants have been removed before coating.

 

Coating Cure Schedule @ 600Micron

Substock temperature

Table Dry

Practical work

Fully Cured

0℃

20 hours

40 hours

24 days

5 ℃

14 hours

30 hours

18 days

10 ℃

6 hours

18 hours

14 days

15℃

4 hours

10 hours

7 days

20℃

4 hours

10 hours

5 days

30℃

3 hours

6 hours

5 days

40℃

2 hours

3 hours

3 days

Remarks:

-For dark coatings in tidal areas such as dams and piles, if the coating is prematurely submerged in water in the undried state after completion, it may appear that the surface is white, but it will not substantially affect the final corrosion resistance of the coating.

-Continuous and smooth adequate ventilation must be ensured during the application and curing of the coating.

 

Use time after mixing(at suitable construction viscosity)

Temperature of paint after mixing

Use time after mixing

0℃

4 hours

10 ℃

2 hours

20℃

1.5 hours

30℃

1 hour

Key words:

The bottom of the ship and the waterline parts with anti-fouling requirements.

Waterline and freeboard

Deck part

Superstructure

Ballast tank

Living Cabin

Battery compartment

Drinking water tank

Pretreatment of steel plate

Oil tank

More products


Leave us a message


Submit
%{tishi_zhanwei}%