Flying Whale 837 Wuxi self-polishing anti-fouling paint

Product overview

It is a high-solid, high-performance, Wuxi self-polishing anti-fouling paint composed of acrylic zinc copolymer resin as base material, cuprous oxide, environmentally friendly anti-fouling agent and exudation additives.

Recommended use

Ship protection paint field:
It is suitable for use as an anti-fouling paint for the bottom and waterline of near-ocean vessels to prevent marine biofouling.
Industrial protective paint field:
It is suitable for use as an anti-fouling paint for preventing marine biological fouling in various facilities such as docks, offshore platforms, navigation marks and underwater gates.

Product Information

Color
Red, green, brown
Gloss
No light
Volumetric solids
64±3%
Recommended dry film thickness
100 microns/approx. 156 microns wet film thickness
Theoretical coating rate
3.37 m2/kg (100 micron dry film meter)
Volatile Organic Compounds (VOC)
360g/L
DensityNote
Approximately 1.9kg/l
Note: Density data are typical parameters and vary with color

Dry data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Paint film surface dry

Solid paint film

Drying time before launching

4 hours

24 hours

24 hours

3 hours

18 hours

18 hours

2 hours

12 hours

12 hours

1 hour

8 hours

8 hours

Overcoating data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Minimum coating interval

Maximum coating interval

24 hours

90 days

18 hours

60 days

12 hours

30 days

8 hours

30 days

Note: 1. The above data are for reference only. The actual drying time and the length of the re-coating interval depend on the film thickness, ventilation, humidity, lower paint and mechanical strength, etc.

2. The surface of the paint film before recoating must be clean and dry, free of pulverization and other pollutants. If necessary, the surface before recoating should be fully napped.

Construction parameters

Thinner/cleaning agent Flying Whale X-102 Thinner
airless spraying

Nozzle diameter: 0.43~0.53mm

Nozzle pressure: 15 ~ 25MPa

Dilution ratio: 0 ~ 5% (by weight)

Gas spraying The use of suitable special equipment, spraying when the need for dilution
Brush/Roller Applicable, recommended for pre-coating and small-scale coating

CONSTRUCTION CONDITIONS

The substrate temperature shall be at least 3 ℃ higher than the air dew point, and the relative humidity shall be lower than 85%. The measurement of temperature and humidity should be carried out at the substrate near the operation point. When the construction is not in an open space, good ventilation must be provided to ensure the normal drying of the paint film.

Surface treatment

All surfaces to be coated shall be clean, dry and free of contaminants and shall be evaluated and treated as ISO8504. Painted surfaces shall be clean, dry and on top of approved anti-rust/tie paint or intact self-polishing anti-fouling paint coating.

Typical supporting

848 Epoxy Universal Primer

2 x 125 microns (dry film thickness)

FJ-18 epoxy joint paint

1 x 60 microns (dry film thickness)

837 Wuxi self-polishing antifouling paint

2 x 100 microns (dry film thickness)

For more scope of use, please consult Flying Whale New Material Company.

Safety and Health

Before using this product, please pay attention to the safety label on the packaging container, refer to and follow the information and precautions related to health and safety in the product safety technical manual of flying whale new material company. During the construction and drying of the product, appropriate ventilation and preventive measures must be adopted to control the solvent concentration within the safety limit to prevent poisoning or hypoxia. Take measures to avoid skin and eye contact with the product. If contact occurs, wash it immediately with suitable detergent, soap and water. If splashed into eyes, rinse with water and seek medical treatment immediately.

Packing specification

Packing barrel specification

Packing weight

20 Litres

30kg

Storage period

Store in a cool, dry, ventilated and dedicated warehouse away from heat sources. Under normal temperature conditions, the storage period is 12 months, and then it needs to be used after passing the inspection.

Precautions

The remaining packaging barrels must be tightly covered after painting to avoid damage caused by moisture. The number of coating lanes and dry film thickness of antifouling paint shall be determined according to the time between ship docking. The number of coating lanes or film thickness will increase with the increase of maintenance interval. When the ship is docked, even if the paint film of the ship's primer is basically complete, the antifouling paint cannot be directly applied to the old paint film. Before applying the antifouling paint, the sludge and salt on the ship's primer film should be washed with fresh water to remove the saponified layer, then the marine organisms attached to the paint film should be removed, the rust and loose old paint film should be removed by sandblasting or polishing, and then 1-2 anti -2 coats should be applied as required. If the paint film of the ship primer has been mostly damaged, it should be whitened, and the bottom antirust paint and bottom antifouling paint should be repainted according to the requirements of the new ship.

Corporate Statement

The above information and data of this product are accumulated according to our test and actual use experience, which can be used as a construction guide. For the construction carried out without our knowledge, we only guarantee the quality of the paint itself and are not responsible for any product performance problems arising from other aspects. We have the right to modify this manual according to the continuous improvement of the product.

Supplementary Notes

Key words:

The bottom of the ship and the waterline parts with anti-fouling requirements.

Waterline and freeboard

Deck part

Superstructure

Ballast tank

Living Cabin

Battery compartment

Drinking water tank

Pretreatment of steel plate

Oil tank

More products


Leave us a message


Submit
%{tishi_zhanwei}%