Flying Whale B43-31 Acrylic Topcoat

Product overview

A one-component quick-drying topcoat composed of thermoplastic acrylic resin, plasticizer, coloring pigment, etc. The paint film has fast drying, low temperature construction, convenient maintenance; has good decoration and durability.

Recommended use

Ship protection paint field:
It is suitable for anti-corrosion decorative topcoat on the surface of hull outer plate, superstructure and other steel structure surfaces.
Industrial protective paint field:
Applicable to the coastal steel structure, oil refining plant, power plant, steel structure and all kinds of equipment and facilities such as anti-corrosion finish.

Product Information

Color
White, sea blue, black and other colors
Gloss
half light
Volumetric solids 40±3%
Recommended dry film thickness 40 microns dry film thickness/approx. 100 microns wet film thickness
Theoretical coating rate 8.7 m2/kg (40 micron dry film meter)
Volatile Organic Compounds (VOC) 530g/L
DensityNote
Approximately 1.15kg/l
Note: Density data are typical parameters and vary with color

Dry data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Paint film surface dry

Solid paint film

4 hours

24 hours

3 hours

18 hours

2 hours

12 hours

1 hour

8 hours

Overcoating data

Substock temperature 5 ℃ 10 ℃ 23℃ 35℃

Minimum coating interval

Maximum coating interval

12 hours

Unlimited

10 hours

Unlimited

8 hours

Unlimited

6 hours

Unlimited

Note: 1. The above data are for reference only. The actual drying time and the length of the re-coating interval depend on the film thickness, ventilation, humidity, lower paint and mechanical strength, etc.

2. The surface of the paint film before recoating must be clean and dry, free of pulverization and other pollutants. If necessary, the surface before recoating should be fully napped.

Construction parameters

Thinner/cleaning agent Flying Whale X-102 Thinner
airless spraying

Nozzle diameter: 0.48~0.59mm

Nozzle pressure: 15 ~ 25MPa

Dilution ratio: 0 ~ 5% (by weight)

Gas spraying The use of suitable special equipment, spraying when the need for dilution
Brush/Roller Applicable, recommended for pre-coating and small-scale coating

CONSTRUCTION CONDITIONS

The substrate temperature shall be at least 3 ℃ higher than the air dew point, and the relative humidity shall be lower than 85%. The measurement of temperature and humidity should be carried out at the substrate near the operation point. When the construction is not in an open space, good ventilation must be provided to ensure the normal drying of the paint film.

Surface treatment

All surfaces to be coated shall be clean, dry and free of contaminants and shall be evaluated and treated as ISO8504.
Painted surfaces shall be clean, dry and intact on a compatible primer.

Typical supporting

848-1 Aluminum Red Epoxy Universal Primer 1 x 125 microns (dry film thickness)
FJ-18 epoxy transition/bonding paint 1 x 75 microns (dry film thickness)
B43-31 acrylic finish 2 x 40 microns (dry film thickness)

For more scope of use, please consult Flying Whale New Material Company.

Safety and Health

Before using this product, please pay attention to the safety label on the packaging container, refer to and follow the information and precautions related to health and safety in the product safety technical manual of flying whale new material company. During the construction and drying of the product, appropriate ventilation and preventive measures must be adopted to control the solvent concentration within the safety limit to prevent poisoning or hypoxia. Take measures to avoid skin and eye contact with the product. If contact occurs, wash it immediately with suitable detergent, soap and water. If splashed into eyes, rinse with water and seek medical treatment immediately.

Packing specification

Packing barrel specification Packing weight
20 Litres 22kg

Storage period

Store in a cool, dry, ventilated and dedicated warehouse away from heat sources. Under normal temperature conditions, the storage period is 12 months, and then it needs to be used after passing the inspection.

Precautions

The remaining packaging barrels must be tightly covered after painting to avoid damage caused by moisture. Contacting with water, acid and alkali is strictly prohibited in the process of painting and coating.

Corporate Statement

The above information and data of this product are accumulated according to our test and actual use experience, which can be used as a construction guide. For the construction carried out without our knowledge, we only guarantee the quality of the paint itself and are not responsible for any product performance problems arising from other aspects. We have the right to modify this manual according to the continuous improvement of the product.

Supplementary Notes

Key words:

The bottom of the ship and the waterline parts with anti-fouling requirements.

Waterline and freeboard

Deck part

Superstructure

Ballast tank

Living Cabin

Battery compartment

Drinking water tank

Pretreatment of steel plate

Oil tank

More products


Leave us a message


Submit
%{tishi_zhanwei}%